Loading...
2023 GFD 🏆 Awards

Silver Winner – Quzhou Electrode Zero Carbon Park | QuzhouJidian E-Mobility Technology Co. Ltd.

Located in Quzhou, Zhejiang Province, the project covers a land area of 1044,878 square meters and a total construction area of 1430,583.04 square meters. It is a new energy industrial park integrating research and development and manufacturing of power cell, power battery, electric motor electronic control drive system, charging system and energy storage system.

Global Future Design Awards 2024: Entries Open! 
Take your work to the next level. Register Now… 

Silver 🏆 Winner
Global Future Design Awards 2023

Quzhou Electrode Zero Carbon Park
Corporate Architecture (Under Construction)

Firm
QuzhouJidian E-Mobility Technology Co. Ltd.

Architect/Designer
Jiang Haihong, Zhang Minfang, Yuan Ye

Design Team
Jin Xiaodan, Wang Mengmeng, Meng Qingyu, Wang Yali, Ma Dejin, Mao Wei, Yang Songlin,Fan Shengyang, Jin Lanxi, Cao Mengyao

Project Location
Quzhou City

Country
China

Photographer/Copyright
©Automotive Engineering Corporation

Social Media Handles
Facebook: Not Available

YouTube: Not Available
Instagram: Not Available
Twitter: Not Available

Website URL
N/A

Under the premise of complying with the principle of production technology and material flow line, the overall planning of the project comprehensively considers the needs of office, conference, exhibition, dining, accommodation and staff activities, and divides the entire plant area into production area, living area and administrative office area. Among them, the production area is divided into reasonable functional modules such as land saving, energy saving and environmental protection, and has efficient flow lines. The flexible layout of the living area reflects the comfortable and leisure attributes, while the administrative office area emphasizes the spatial texture of efficiency and integration.

The administrative service center, multi-function hall and canteen are located in the administrative office area, which are connected by the water footpath, air corridor and landscape platform and penetrate into each building, enjoying smooth space flow line and coherent space experience. Echoing each other at a distance with the three buildings, the activity center is located in the living area on the east side of the administrative office area. The four buildings adopt the overall spatial approach of “appropriate construction”, and the horizontal square with appropriate scale, the central landscape belt and the semi-enclosed buildings form a three-dimensional spatial combination, which is gentle and pleasant. The cohesive atrium layout is adopted by the administrative service center, and a sunshine atrium is built in the central area of the building. The external image is integrated, concise and powerful, and the internal spaces are integrated and interwoven to bring a relaxed and comfortable environment.

The overall shape of the building adopts the diamond-cut form, and the roof becomes the fifth facade of the building. Due to the unified consideration of the three dimensions of building volume, building height and roof cutting form, the four buildings are unified as a whole, full of rhythm, and also highlight a strong sense of existence. The facade and roof are made of aluminum plates, transparent glass curtain walls and perforated aluminum plates to build a technological and innovative architectural style with modern materials. The convergence and transition of corporate brand visual elements are mostly applied to walls, roofs and glass to enhance identification, and the corporate gradient elements rely on perforated aluminum plates to add richness and details to the whole building.

The project fully takes into account the energy efficiency management of the building. Through the proper layout and facilities, the architects use the atrium’s lighting and natural ventilation design to maximize the use of natural light and air flow to weaken the reliance on artificial lighting and ventilation systems, thereby reducing energy consumption and achieving energy saving. At the same time, the design improves the thermal insulation performance of the outer protective structure. Large areas of solar photovoltaic panels are placed on the roof of the workshop to serve as the main source of energy supply for the plant, so as to achieve efficient, clean, low-carbon, circular and sustainable development of manufacturing industry, promote harmonious integration of industrial civilization and ecological civilization, share the economy, society and ecology, and achieve win-win results.